AEA-Albania Energy Association
  • Main
  • About Us
  • Services
  • Sectors
  • News
  • EventsEvents
  • PublicationPublication
  • Contact Us
AEA-Albania Energy Association
  • Main
  • About Us
  • Services
  • Sectors
  • News
  • EventsEvents
  • PublicationPublication
  • Contact Us
AEA-Albania Energy Association
  • Home Page
  • About Us
  • Sectors
  • Our Services
  • News
  • Contact Us

Voltalia receives license for Spitalla PV plant in Albania

December 2, 2025 by AEA in News

French renewable energy company Voltalia obtained a 30-year license for its Spitalla solar park at the Albanian port city of Durrës. It won the project at a renewable energy auction in 2021.

In its latest update, the Energy Regulatory Authority (ERE) of Albania authorized Spitalla Solar to generate electricity from a photovoltaic plant of 90 MW. France-based Voltalia has established the firm for a project for which it won state support in 2021.

The solar power auction for the Spitalla site, just north of Durrës, a port city on the Adriatic Sea, was for 100 MW in peak capacity. The renewable energy company started construction works late last year. At the time, it scheduled the commissioning of the facility for the second half of 2027.

Similarly, Voltalia developed and built its Karavasta PV plant of 140 MW in peak terms, won at a previous solar power auction. It is the largest in Albania.

The auctions are for contracts for difference (CfDs), but the winners are actually working with power purchase agreements (PPAs) with fixed prices. A procedure is underway to secure market liquidity, which would enable the switch. Notably, the Albanian Power Exchange (ALPEX) was launched already in April 2023.

Spitalla’s CfD is for 15 years and 70 MW in peak capacity. Voltalia, headquartered in Paris, earlier said it would sell the rest of the output under a long-term contract with buyers in the private sector.

Since last year, there is more electricity generation capacity in private ownership in Albania than in the system under state-controlled utility KESH. Growth in the solar power segment is the biggest factor behind the change.

Post Views:98
December 2, 2025
electricityERErenewable energy auctionsrenewable energy sourcessolar powerSpitallaVoltalia
SHARE
  • Email
  • X
  • Facebook
  • Pinterest
  • Linkedin
  • Vkontakte
  • WhatsApp
Greece to support 130 MW in agrivoltaics through tariffs
Serbia’s EPS starts trial operation of its first wind park Kostolac

AEA – Albania Energy Association is a industry association dedicated to representing the interests of Albanian and West Balkan for energy producers and consumers. AEA works to advance the development and adoption of sustainable energy solutions in Albania and the Western Balkans, supporting the region’s transition toward a cleaner, more secure, and more competitive energy future. AEA is registered by decision of the Court of Tirana, DECISION NO. 3032, (VAT:L11827451K).

[email protected]

Address
Blv Zogu 1
Tirana
1057
ALBANIA

LinkedIn  |  Facebook
Events
May 25, 2022 Connecting Green Hydrogen Europe 2022
May 25, 2022 Energy Week Western Balkans 2022
Copyright © Albania Energy Association