Tags Adam Cortese Serbia’s TSO EMS signs grid connection contracts for 11 renewable power plants aea May 11, 2025 Serbia’s transmission system operator Elektromreža Srbije signed grid connection contracts today for 11 renewable power plants. TSO Elektromreža Srbije (EMS)
Tags ACER Belgrade Energy Forum 2025 – 50 speakers at eight panels to track pace of SEE energy transition aea April 14, 2025 The agenda of the third Belgrade Energy Forum, taking place on May 14-15, has been finalized with the addition of